{"id":62,"date":"2017-07-25T17:04:04","date_gmt":"2017-07-25T17:04:04","guid":{"rendered":"https:\/\/zagorje-gradnja.hr\/novo\/?page_id=62"},"modified":"2017-07-25T17:13:59","modified_gmt":"2017-07-25T17:13:59","slug":"djelatnosti","status":"publish","type":"page","link":"https:\/\/zagorje-gradnja.hr\/en\/djelatnosti\/","title":{"rendered":"Services"},"content":{"rendered":"<p><\/p>\n<h3>Construction of the roadway<\/h3>\n<ul>\n<li>The substrate for the road<\/li>\n<li>Asphalt pavement<\/li>\n<li>concrete pavement<\/li>\n<li>Pavement with stone blocks<\/li>\n<li>Equipment road<\/li>\n<\/ul>\n<h3>Hydro power<\/h3>\n<ul>\n<li>Dams and dikes<\/li>\n<li>Extraction of sand and gravel \u2013 regulation works<\/li>\n<li>Hydraulic filling and melioration<\/li>\n<li>Erosion protection, insurance Coast<\/li>\n<\/ul>\n<h3>Drainage and pipelines<\/h3>\n<ul>\n<li>Water intakes for water supply<\/li>\n<li>Main pipelines and distribution systems<\/li>\n<li>Gas pipelines, oil pipelines and distribution systems<\/li>\n<li>Drainage and sewage<\/li>\n<\/ul>\n<h3>Hydro power<\/h3>\n<ul>\n<li>Construction of coastline, ports and constitution<\/li>\n<\/ul>\n<h3>Demolition<\/h3>\n<ul>\n<li>Demolition of buildings<\/li>\n<li>Demolition of buildings by heavy machinery<\/li>\n<li>Demolition of contaminated material<\/li>\n<li>Demolition of buildings with explosives<\/li>\n<li>Drilling \u00a0concrete<\/li>\n<\/ul>\n<h3>Earthwork<\/h3>\n<ul>\n<li>Excavation and removal<\/li>\n<li>Relocation of the country<\/li>\n<li>Filling and backfilling<\/li>\n<li>Earthworks on the rocks of which is used explosives<\/li>\n<\/ul>\n<h3>Landscaping, sports fields, playgrounds<\/h3>\n<ul>\n<li>Sports grounds and playgrounds<\/li>\n<li>landscaping<\/li>\n<li>reservation<\/li>\n<\/ul>\n<h3>Geotechnical Works<\/h3>\n<ul>\n<li>Drainage<\/li>\n<li>Supporting foundations<\/li>\n<\/ul>\n<h3>Construction of railways<\/h3>\n<ul>\n<li>Lower machine Railways<\/li>\n<li>Upper machine Railways<\/li>\n<li>Repairs and maintenance<\/li>\n<\/ul>\n<h3>Highways, roads, railways,\u00a0and runway<\/h3>\n<h3>Port waterways, barriers, embankments and other water construction<\/h3>\n<h3>Landscaping<\/h3>\n<h3>Reservation<\/h3>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Construction of the roadway The substrate for the road Asphalt pavement concrete pavement Pavement with stone blocks Equipment road Hydro power Dams and dikes Extraction of sand and gravel \u2013 regulation works Hydraulic filling and melioration Erosion protection, insurance Coast Drainage and pipelines Water intakes for water supply Main pipelines and distribution systems Gas pipelines, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":66,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-62","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/zagorje-gradnja.hr\/en\/wp-json\/wp\/v2\/pages\/62","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zagorje-gradnja.hr\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/zagorje-gradnja.hr\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/zagorje-gradnja.hr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/zagorje-gradnja.hr\/en\/wp-json\/wp\/v2\/comments?post=62"}],"version-history":[{"count":2,"href":"https:\/\/zagorje-gradnja.hr\/en\/wp-json\/wp\/v2\/pages\/62\/revisions"}],"predecessor-version":[{"id":65,"href":"https:\/\/zagorje-gradnja.hr\/en\/wp-json\/wp\/v2\/pages\/62\/revisions\/65"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zagorje-gradnja.hr\/en\/wp-json\/wp\/v2\/media\/66"}],"wp:attachment":[{"href":"https:\/\/zagorje-gradnja.hr\/en\/wp-json\/wp\/v2\/media?parent=62"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}